Frog Hollow Basin Floods 150 Acres of Hurricane Fields

About 150 acres of agricultural land in Hurricane flooded this week after too much water flowed through the Frog Hollow Debris Basin, KUTV reported.

Originally constructed in the 1950s, the basin was designed to gather stormwater during rainstorms and meter it gradually into Frog Hollow Wash. However, too much water passed through the structure three times this fall, including in August, October, and this week.

“The worst part of it down here we cleaned out, but we know there’s other issues that are going to happen,” Hurricane Mayor Clark Fawcett said.

“It way overwhelmed the capacity of this ditch and washes,” Fawcett told KUTV. “It came out of the banks, ran into the fields, went from one field to the next, went across a couple of our roads. It ran for probably 24 hours, running that water out.”

Hurricane mayor weighs widening wash after basin flooding hits fields — KUTV 2 News Salt Lake City

Farmer Owen Flanders described the extent of the inundation across the local acreage. Earlier this season during previous floods, a section of 3,000 South linked to State Route 7 gave way, resulting in a $150,000 repair bill.

“It was a whole long lake down there,” Flanders told KUTV. “I’ve never seen anything like that. It had probably had three, four, five feet of water in it going over the road.”

Fawcett said that the basin’s design failed to account for the volume of water the downstream wash could handle. Bypass holes currently let too much water pass through.

“We either got to adjust those, which we’re talking to some of the people involved in dam safety and others, to see if that’s something we can do, or we just got to enlarge the wash, find a place for it to go,” Fawcett said.

City officials are working with the Natural Resources Conservation Service to seek funding for necessary infrastructure updates. In the meantime, municipal leaders shared plans to recruit an engineer to formulate a new detention basin design situated above Gould Wash.

Farmers near Frog Hollow Wash hope the city widens the channel to prevent damage to hay and delayed harvesting. Excess moisture damages the soil structure and halts field operations.

“It hurts the soil quite a bit when you get in the field when it’s wet,” Flanders told KUTV. “I have a field down at my house and I won’t plan on cutting it this year just because it’s too cold and too wet, and it’s not drying out as quickly as I want it to.”

The structure was constructed in the 1950s to collect rainwater and release it slowly into Frog Hollow Wash.

Water passed through the basin in excessive amounts three times this fall, including in August, October, and this week.

Hurricane, a city of 20,036 in Washington County, Utah, was settled in 1896 and named after a whirlwind blew the top off a buggy carrying Erastus Snow. The community was established as part of Brigham Young’s “Cotton Mission” and historically operated large peach and apricot orchards for the LDS Church.

The Virgin River forms nearly all of the city’s northern border and indirectly provides water to most of Washington County. Hurricane Canal, completed in 1904, has been empty since 1985, with a recreational trail now running alongside it.

Part of 3,000 South connecting to State Route 7 collapsed during earlier autumn floods, requiring $150,000 in repairs.