Ghana is preparing to construct a 13.5-kilometer access road to the site of its first exploratory well in the onshore Voltaian Basin, according to MyJoyOnline. The planned drilling site is located in Chegu, situated within the Mion District of northern Ghana.
Site Inspection and Infrastructure Preparations
A joint delegation from the Ghana National Petroleum Corporation (GNPC) and its operating subsidiary, GNPC Explorco, recently inspected the Chegu location, as reported by MyJoyOnline. The visit allowed technical teams to assess area readiness and identify priority civil and engineering works before drilling operations begin.
According to GNPC Explorco Managing Director Samuel Opoku Arthur, construction on the 13.5-kilometer access road is scheduled to start in the coming weeks. This infrastructure phase marks the next critical stage in project preparation for the inland basin.
Logistical Requirements for Voltaian Basin Exploration
The new access road is designed to facilitate the heavy transport required for deep drilling operations. MyJoyOnline notes that the route will ensure the safe delivery of drilling rigs, heavy machinery, and specialized equipment directly to the well site.
Beyond equipment transport, the road will support ongoing site clearing, land leveling, and related civil engineering works. These steps are necessary before exploratory drilling can safely commence in the remote northern district.
Testing Hydrocarbon Potential in Ghana’s Interior
The upcoming drilling program aims to test the hydrocarbon potential of the Voltaian Basin, which covers large portions of northern and central Ghana.
Did you know?
Stakeholder Engagement and Environmental Standards
Prior to visiting the site, representatives from GNPC and GNPC Explorco met with the traditional ruler of Chegu. Both companies confirmed their commitment to maintaining open communication with traditional authorities and local community members throughout the project lifecycle.

Furthermore, GNPC Explorco stated that all construction and exploration activities will incorporate strict environmental protection measures, adhering to applicable operational standards in the Mion District.
Frequently Asked Questions
Where is Ghana’s first onshore Voltaian Basin exploratory well located?
The site is located in Chegu, within the Mion District of northern Ghana, according to MyJoyOnline.
Who is managing the exploration project?
The project is being managed by the Ghana National Petroleum Corporation (GNPC) and its operating subsidiary, GNPC Explorco, under the leadership of Managing Director Samuel Opoku Arthur.
What is the purpose of the 13.5-kilometer access road?
The road will allow the delivery of drilling rigs, heavy machinery, and equipment, while also facilitating site clearing and civil works, as reported by MyJoyOnline.
How will local communities be involved?
GNPC and GNPC Explorco representatives have met with the traditional ruler of Chegu to engage with traditional authorities and the local community while committing to strict environmental protection measures.
Stay Updated on Energy Developments
Want to track Ghana’s evolving energy sector and upcoming exploration milestones? Share your thoughts in the comments below or explore our latest coverage on regional infrastructure projects.
Related reading