Mayo Clinic is advancing a $2.2 billion renovation of its Phoenix hospital campus, a project designed to add 1.2 million square feet of space and thousands of new jobs.
The overhaul sits just south of the Loop 101 and east of 56th Street at 5777 E. Mayo Blvd. When originally announced in March 2025, total development costs were expected to reach $1.9 billion, building upon an earlier $748 million investment at the same medical complex.
The expansion delivers nearly 60% more room to treat patients across two new buildings. Upgrades include 11 new operating rooms, 48 patient rooms, and 14 intensive-care units, alongside a projected 62% boost in MRI capacity and a 44% increase in CT scanner capacity.
Mayo Clinic filed a project narrative with the city of Phoenix titled “Hope Unbound” to outline the initial phases of the transformation. Three general contractors and five design partners are sharing the workload for the campus update.
At the heart of the design is a model called “care neighborhoods,” which changes how treatment is delivered.

“It’s a way of bringing the medicine to the patient instead of the patient to the medicine,” said Dr. Mitchell Humphreys, a physician and director of the capital transformation project. “Any kind of support they need is all in one place. So they don’t have to go to multiple different places to receive their care.”
The total development budget has risen from the $1.9 billion projected when the expansion was first announced in March 2025, according to Hoodline’s review of ABC15 reporting. That earlier figure built on a $748 million investment already made at the Phoenix campus.
The Phoenix overhaul is part of Mayo Clinic’s broader Bold. Forward.

The outlet also notes the expansion targets a 31% increase in operating rooms, alongside the previously reported 62% boost in MRI capacity and 44% rise in CT scanner capacity.
Projections for job creation vary across reports as the plans have evolved. While initial announcements in 2025 targeted 2,000 high-wage positions, subsequent filings project 3,500 jobs, and other project materials estimate 2,800 new positions. Humphreys said that the hiring wave will cover a wide spectrum of roles.
“We will be adding all kinds of different positions, not just physicians and providers, allied health, secretaries, technicians, radiology technicians, cleaning, food services, the whole gamut,” Humphreys said.
Humphreys said that the expansion is necessary because regional demand currently outstrips capacity, allowing the facility to concentrate on serious and complex cases. Construction on the Phoenix campus is currently in the design stage and is expected to run until at least 2032.
Worth a look