Police in Lučenec are cracking down on drivers using a residential courtyard as an illegal shortcut during ongoing road reconstruction on Novohradská Street.
The reconstruction of Novohradská Street, one of the city’s most important and busiest thoroughfares, entered its second month under the contractor Eurovia SK, following a project costing over two million euros, according to Sme. Despite detours put in place for the temporary traffic restrictions, drivers have been cutting through the courtyard on Novohradská Street, prompting a warning from municipal police on Tuesday, November 24, on a social network.
Municipal and state police are actively monitoring compliance with traffic signs in the area.
“The courtyard on Novohradská Street is not intended for transit passage and the traffic ban remains valid even during the reconstruction of the adjacent road.”
emphasized the Lučenec Municipal Police.
Authorities said that the checks aim to ensure the safety of residents, children, and other vulnerable road users. A no-entry sign prohibiting all vehicles in both directions is posted at the entrance, with an exemption solely for traffic service vehicles.
According to police, the traffic service exemption covers supply vehicles, vehicles with parking permits, buses transporting children, and vehicles whose drivers or operators have a residence, headquarters, garage, or business located past the sign.
Additional exemptions apply to vehicles performing repairs, servicing, technical or originality inspections, toll unit drop-offs at the nearest sales point, and visitors to the Partizánska Kindergarten.
Construction work on the project is scheduled to run until the end of September next year, according to information published by Eurovia SK on its portal. The project is divided into two phases and encompasses the resurfacing of local roads with new asphalt across an area exceeding 4,700 square meters.
The overhaul also includes the reconstruction of existing parking lots and the construction of new ones covering approximately 1,900 square meters, alongside nearly 3,600 square meters of interlocking paving for sidewalks and a bicycle path spanning over 930 square meters.
The project involves upgrading the drainage system, stormwater sewer, traffic signage, and public lighting, as well as installing new urban furniture.
Lučenec, the economic centre of the Novohrad region covering the Poltár and Veľký Krtíš districts in south-central Slovakia, anchors a population of 24,427 across 47.80 km² as of December 2025. Its role as the primary urban hub for the surrounding districts means Novohradská Street functions as a critical artery for daily commerce and transit.
The construction team will revitalize the public space by building a new fountain and carrying out landscaping, which includes planting 47 new trees to give Novohradská Street a modern appearance and higher-quality infrastructure.
Keep reading