Robot ASTRA Autonomously Assembled a Structure in Space

Operating in Earth orbit without astronauts present, the robotic device ASTRA autonomously assembled a structural segment composed of composite tubes and aluminum connectors on March 30, 2026, as reported by Spider’s Web.

Developed by the California Institute of Technology with backing from the Defense Advanced Research Projects Agency, the Autonomous In-Space Tensioned Reflector Assembly measured approximately 1 meter cubed prior to deployment, according to Spider’s Web.

The device expanded a segment of a planned reflector antenna measuring roughly 1.4 meters, geekweek.interia.pl reported. The flight model launched aboard a Falcon 9 rocket from Vandenberg Space Base in California during the Transporter-16 mission, housed inside a Vigoride-7 orbital vehicle operated by Momentus, as detailed by Spider’s Web.

Engineers packed composite tubes, aluminum connectors, and a thin radio frequency reflective material directly into the device instead of launching a pre-assembled antenna, Spider’s Web reported. A mechanical manipulator removed the components from feeders and joined them into repeated truss sections, operating in zero gravity much like an automated assembly line, according to Spider’s Web.

“Opracowanie tak złożonego ładunku w tak krótkim czasie było ogromnym przedsięwzięciem dla naszego małego zespołu,” said Sergio Pellegrino, leader of the ASTRA team at the California Institute of Technology, as reported by geekweek.interia.pl.

Program NOM4D goals

The demonstration forms part of the Novel Orbital and Moon Manufacturing, Materials and Mass-efficient Design program managed by the Defense Advanced Research Projects Agency, geekweek.interia.pl reported.

The initiative explores manufacturing large orbital structures to bypass the size limits and launch vibration tolerances of traditional spacecraft, according to reports by geekweek.interia.pl and Onet. Future orbital infrastructure could span hundreds of meters or even kilometers through automated in-space fabrication, Onet reported.

Artystyczna wizja automatu budującego duże struktury w przestrzeni kosmicznej
Photo: Onet

“Gdy osiągnie się limit wielkości, przy którym konstrukcji nie da się wstępnie zbudować na Ziemi i rozłożyć, trzeba zacząć zastanawiać się, jak wwnosić je w przestrzeni kosmicznej,” Pellegrino told geekweek.interia.pl.

The initial flight under the Novel Orbital and Moon Manufacturing, Materials and Mass-efficient Design program occurred in 2022, geekweek.interia.pl reported.

A subsequent experiment scheduled before the end of the year involves a team from the University of Illinois Urbana-Champaign sending a production payload to the International Space Station, as reported by geekweek.interia.pl and UA.NEWS. That test will evaluate converting liquid materials into solid structures with the participation of station astronauts, geekweek.interia.pl reported.

“W przyszłej gospodarce kosmicznej będziemy potrzebować dużych rzeczy,” Andrew Detor, program manager at the Defense Advanced Research Projects Agency, told geekweek.interia.pl.

A Robot Built a Truss in Space — Meteor Makers

Orbital assembly limits

The initial plan for the California Institute of Technology demonstrator aimed for a complete antenna 1.4 meters in diameter comprising 11 truss segments, Onet reported. Two initial fragments were assembled on Earth and placed inside the machine, while the robot was tasked with building subsequent segments on orbit and feeding completed sections outward, according to Onet.

Ground controllers managed the process using an identical laboratory copy of the machine when troubleshooting arose, operating through seven to eight communication windows daily lasting 15 minutes each, Onet reported. Due to time constraints and communication limits, the machine completed the third segment but did not finish the remaining eight sections, leaving the full antenna unbuilt, Onet reported.

“Nie ukończono pozostałych ośmiu segmentów, więc antena nie powstała,” Onet reported.

Orbital manufacturing questions

What does ASTRA stand for?

The acronym stands for Autonomous In-Space Tensioned Reflector Assembly, designating the robotic system created to build reflector antenna segments in orbit, according to UA.NEWS.

Robot astra samostiyno zibrav konstrukts
Photo: UA.NEWS

Which agencies funded the project?

The project received support from the Defense Advanced Research Projects Agency and was developed by researchers at the California Institute of Technology, as reported by geekweek.interia.pl.

What vehicle carried the hardware into orbit?

A Falcon 9 rocket launched the payload on March 30, 2026, from Vandenberg Space Base as part of the Transporter-16 mission, carrying the device aboard a Momentus Vigoride-7 orbital vehicle, Spider’s Web reported.

How many communication windows did engineers have daily?

Ground teams had access to seven or eight communication windows per day, with each window lasting 15 minutes, according to Onet.