Zeno Power Clears Final Hurdle for Subsea Nuclear Battery Deployment

Nuclear battery developer Zeno Power operated an Electrically Heated Stirling Generator on the seabed for two weeks, producing over 20 watts of power in a demonstration that cleared the final integration hurdle for upcoming deployments.

The Seattle-based company completed the underwater test as the third and final box to check before integrating a Strontium-90 heat source into the system for full deployment next year, according to Tectonic. The recent deployment marked the first time an Electrically Heated Stirling Generator has generated power on the seabed, the company reported.

The microwave-sized nuclear batteries use radioisotopes that decay and produce heat over decades, converting that thermal energy into electricity. While the recent test used an electric heater rather than radioactive material, the hardware shared the exact form factor as the nuclear-powered units scheduled for delivery next year.

“We’ve built a Strontium-90 heat source, we’ve now built the electrically heated system that converts that heat into electricity, and we’ve demonstrated the logistics and the operations of deploying and recovering this system from the seabed,” Tyler Bernstein, co-founder and CEO of Zeno Power, told Tectonic.

“Next year, we’ll bring all of that together to integrate the nuclear heat source into the Electrically Heated Stirling Generator and deploy that on the seabed again with our first customers.”

Pentagon Contracts and Deep-Sea Power Needs

The United States military faces acute energy shortages in remote operating environments where solar power fails and standard batteries quickly die. To counter these constraints, Zeno has secured $60 million in contracts with the Pentagon and NASA to develop and deploy its decade-long power sources, Bernstein told Tectonic.

Those contracts include a $7.5 million award from the U.S. Department of Defense announced on October 31, 2023, originating from the Operational Energy Innovation office and the Office of Naval Research. The initiative, known as the Distributed Energy Provided Throughout the Seas program, aims to build decentralized seabed energy nodes to power long-endurance sensors and autonomous undersea vehicle charging stations.

“As we’re seeing great power competition rise in the world, we’re seeing huge investments in the deep sea, in the Arctic, and in space,” Bernstein told Tectonic. “These are frontiers that will define the coming century, but these are energy-constrained environments where batteries die quickly, infrastructure doesn’t exist, and solar power doesn’t work.”

“Energy is one of the biggest constraints to operations and to subsea superiority, and the holy grail in that market has always been a distributed, persistent energy source that can sustain these platforms for years at a time, and that is what we're now delivering,” Bernstein told Tectonic.

The technology revives a historical approach previously utilized by the U.S. government between the 1960s and 1980s, when strontium-90 radioisotope power systems powered maritime navigational buoys and undersea equipment. Zeno is partnering with Blue Origin and Sunpower to develop the Stirling conversion systems for both maritime use and lunar surface applications.

Frequently Asked Questions About Seabed Nuclear Power

What isotope do Zeno Power batteries use?

Zeno’s nuclear batteries utilize Strontium-90, a radioisotope that decays over decades to produce heat, which is subsequently converted into electricity by a Stirling generator.

When will the first nuclear-powered units deploy?

Zeno Power expects to deliver and deploy its first nuclear-powered units with government and commercial customers starting next year, following the successful seabed recovery of its electrically heated generator test.

Zeno Power was founded in 2018 by Vanderbilt University alumni Tyler Bernstein, Jonathan Segal, and Jake Matthews. The company originated from a university project that explored advanced nuclear applications and ways to utilize used nuclear fuel.

Since then, the organization has grown to employ 106 people and maintains dual headquarters in Seattle and Washington, D.C. In 2023, the firm achieved a key milestone by successfully demonstrating its first nuclear prototype at the Pacific Northwest National Laboratory, supported by a fuel supply secured from the U.S. Department of Energy through the recycling of legacy radioactive material.

Which military offices funded the seabed project?

Funding for the DEPTHS program comes from the Department of Defense’s Operational Energy Innovation office and the Office of Naval Research.