Vancouver’s Oakridge-41st Avenue SkyTrain station is undergoing a significant physical expansion that will connect the transit hub directly to the newly opened Oakridge Park mall through an underground corridor. This project, which includes a secondary station entrance and enhanced passenger amenities, aims to accommodate rising ridership and serve the thousands of residents and workers expected to occupy the surrounding mixed-use development by 2027.
How does the new underground corridor change transit access?
The underground connection provides a weather-protected path between the Canada Line station and the mall’s north atrium. According to development plans, this subterranean route eliminates the need for passengers to exit to street level during inclement weather. The corridor features a variety of service-oriented retailers, including Purdy’s Chocolatier and various quick-service food options. The project also incorporates public washrooms directly adjacent to the transit link, addressing a long-standing need for station-integrated facilities. The connection is designed to handle increased pedestrian traffic as the Oakridge Park site transitions into a major regional destination.

The Oakridge-41st Avenue station recorded 2.33 million annual boardings in 2024. While this represents a recovery from pandemic-era lows, it remains below the 2018 peak of 2.9 million boardings observed before major construction began.
What improvements are coming to the station’s street-level entrance?
In addition to the underground link, TransLink and the project developers are overhauling the primary street-level entrance. Official project documents outline the installation of a visually-striking, glass-covered timber canopy designed for expanded weather protection. The upgrade includes two additional escalators—notably the station’s first down escalator from street level—and a new elevator to improve accessibility. These modifications are intended to bolster the station’s capacity to serve the 5,000 on-site jobs and 6,000 future residents of the Oakridge Park development.
How does Oakridge-41st Avenue compare to regional transit hubs?
The scale of the Oakridge-41st Avenue expansion reflects its status as a key junction point for the Canada Line and the R4 41st Avenue RapidBus. TransLink statistics indicate the R4 route is one of the busiest in the system, creating a high volume of transfers at this location. While current ridership is trailing 2018 figures, the station’s design is future-proofed for high-density growth. Developers are planning for additional residential and retail expansion in the nearby Heather Lands and Mayfair West areas, which will likely rely on this upgraded station as a primary transit gateway.
Project Timeline and Future Phases
| Project Component | Expected Completion |
|---|---|
| Station Expansion/Secondary Entrance | Summer 2026 |
| Safeway Grocery Store | Summer 2026 |
| Civic Centre & Library | 2027 |
If you are commuting through Oakridge, keep an eye on the north atrium. It currently serves as the central hub for valet services and ride-hailing pick-ups, making it the most efficient spot to transition between the mall and street-level transportation.
Frequently Asked Questions
- When will the secondary station entrance open? The secondary entrance is expected to reach full completion this summer.
- Are there public washrooms at the station? Yes, the new underground corridor includes public washrooms located near the Petit Pont retailer.
- How many people use this station? In 2024, the station saw 2.33 million annual boardings, ranking it 24th busiest in the SkyTrain network.
- What other transit options connect here? The station serves as a major transfer point for the R4 41st Avenue RapidBus.
Have thoughts on the new Oakridge infrastructure? Share your experience with the transit upgrades in the comments below or subscribe to our newsletter for the latest urban development updates in Vancouver.
Related reading
